Tell us what is difficult
Share the current tub or shower, mobility device, transfer method, caregiver help, home type, and the goal for daily bathing.
Accessible-shower guidance • South Florida
In Broward, Miami-Dade, and Palm Beach counties, an accessible shower typically costs $3,500–$15,000. A tub-to-shower conversion starts around $3,500, and most land between $4,000 and $8,000. A curbless, zero-entry, or roll-in shower runs $8,000–$15,000 because the floor is re-sloped for a linear drain. Safe In Place does a free in-home assessment and matches a licensed contractor. We connect you with a licensed, vetted local contractor.
Serving Miami-Dade, Broward, and Palm Beach
Guide: who can install a walk-in shower for a senior in Broward County
In a condo or HOA, read whether the board can say no to a walk-in shower or a stair lift.

In Broward, Miami-Dade, and Palm Beach counties, an accessible shower typically costs $3,500–$15,000. A tub-to-shower conversion starts around $3,500, and most land between $4,000 and $8,000. A curbless, zero-entry, or roll-in shower runs $8,000–$15,000 because the floor is re-sloped for a linear drain. Safe In Place does a free in-home assessment and matches a licensed contractor. We connect you with a licensed, vetted local contractor.
| Project | Typical range | What that means |
|---|---|---|
| Accessible shower | $3,500–$15,000 | The full planning range, from a simpler conversion to a curbless shower. |
| Tub-to-shower conversion | $3,500–$8,000 | Starts around $3,500. Most land between $4,000 and $8,000. |
| Curbless, zero-entry, or roll-in | $8,000–$15,000 | The floor is re-sloped for a linear drain. |
Planning ranges for Miami-Dade, Broward, and Palm Beach counties. Safe In Place provides a free in-home assessment and matches one licensed contractor. We connect you with a licensed, vetted local contractor. The written quote after measurement sets the price. Se habla español.
How Safe In Place helps
You do not need to decide between low threshold, zero entry, or roll-in before calling. We help clarify what the person needs and what the home may support.
Share the current tub or shower, mobility device, transfer method, caregiver help, home type, and the goal for daily bathing.
We consider entry height, opening, approach space, seating, controls, drainage, floor construction, and whether a smaller change may be enough.
We identify an appropriate professional for the likely accessibility, plumbing, waterproofing, and construction scope.
The contractor measures the site, verifies feasibility and approvals, provides the quote, and performs the work.
Which shower fits the need?
Ask for the actual finished threshold, usable opening, interior space, and room-side approach. Marketing names alone do not tell you whether the shower will work.

A curb remains
Useful for general shower remodeling, but “walk-in” does not automatically mean low entry or wheelchair accessible.
A smaller step
Can work when the tub wall is the main obstacle and the user can safely cross a measured raised transition.
A level transition
Removes the conventional curb, but still requires floor depth, inward slope, drainage, waterproofing, and water containment.
Entry + usability
Adds sufficient approach, opening, maneuvering, controls, support, and caregiver space for the actual chair and routine.
A useful distinction
A flush opening can be part of an accessible design, but it does not answer every usability question. A wheelchair-accessible shower also has to work with the room outside it.
Describes a genuinely flush or essentially level room-to-shower transition. Confirm the finished condition because product terminology varies.
A performance goal based on the actual chair, approach direction, transfer method, clear opening, controls, seat, bars, and caregiver needs.
A defined configuration when ADA scoping applies. The threshold is only one part of the required compartment, clearance, controls, bars, and other details.
ADA reference: A private residential shower can be designed around ADA reference geometry without claiming that the ADA automatically governs the home.
Design around the person
The strongest plan follows the full bathing sequence: approach, enter, turn, transfer, sit or stand, reach, receive help, and exit onto a dry route.
Measure the walker, wheelchair, or shower chair and account for toilet, vanity, door, and glass conflicts outside the shower.
Determine whether the person remains in a rolling chair, transfers to a folding seat, uses a bench, or needs open floor space instead.
Plan placement from actual movements, then install the needed blocking or other approved structural attachment before walls are closed.
Place the spray, valve, and storage where the user can reach them from the intended bathing position without stepping into cold water.
Avoid a door swing, sliding panel, or fixed glass section that narrows the opening or blocks assistance and transfers.
Choose a suitable textured surface, drainage layout, and even lighting while avoiding promises that any floor is completely slip-proof.
Reference geometry—not a universal home prescription
There is no single residential size that works for every wheelchair, transfer, or caregiver. ADA configurations provide useful reference points when they are explained completely.
30 × 60 in minimum
Also uses a 60-inch-wide entrance across the face and adjacent 30-by-60-inch clear floor space.
36 in wide × 60 in min deep
Uses a 36-inch-minimum entry at one end of the long side and a different seat/control arrangement.
36 × 36 in
A distinct seated-transfer configuration with a 36-inch entry and 36-by-48-inch clear floor space in front.
These are ADA reference configurations. They do not automatically govern an ordinary private home, and caregiver-assisted bathing can require more or differently arranged space.

How true curbless construction works
A level entrance still needs enough vertical fall to move water toward the drain. The builder has to create that depth through a recessed shower zone, a compatible sloped system, a floor-height strategy, or another project-specific assembly.
Florida’s current residential shower-floor reference requires a uniform slope toward the drain of at least ¼ inch per foot, or 2%. Projects must follow the code and local requirements in effect when the work is performed.
Drainage and water control
Linear drains can support a single-plane slope and simplify some tile layouts. A properly designed point drain can also work, typically with the floor sloping toward it from multiple directions.
Tile and grout are finishes, not the full water-control system. The receptor or membrane must integrate with the drain, seams, corners, walls, seats, niches, and penetrations.
A watertight assembly can still allow spray to escape through an open entrance. Shower depth, head direction, drain location, slope, glass, curtain, and opening width all matter.
Construction approaches
Compare the complete installed system—threshold, dimensions, drainage, joints, maintenance, repair strategy, and support for the user—not just the visible finish.
Offers the most control over geometry, drain, seat, niche, and appearance. Slope and waterproofing workmanship are especially important, and grout adds maintenance.
Factory-sloped trays and integrated membranes can support curbless tile layouts when the floor height and drain conditions fit the system.
Accessible bases can provide low, ramped, or roll-in entries with fewer joints and less site fabrication, but fixed sizes and drain locations limit customization.
Custom bases or large wall panels reduce grout joints and can pair accessibility at the floor with a different wall finish. Interfaces still need correct detailing.
South Florida project planning
Miami-Dade, Broward, and Palm Beach homes include detached houses, condos, and high-rises with different slabs, plumbing, jurisdictions, and association rules.
A true curbless retrofit may require concrete removal, plumbing work, inspection, and restoration when the drain or receptor must be lowered.
Do not assume a suspected post-tensioned slab can simply be cut. Building records, management, locating, and engineering may be needed before penetrations are planned.
Association approval, insurance, work hours, shutoffs, service access, structural floors, and common plumbing can shape the design and schedule.
Plumbing relocation, slab or structural work, and electrical changes commonly trigger review. The contractor should identify the correct city or county authority for the property.
A practical alternative: When a flush floor would require disproportionate work, a carefully selected low-threshold or ramped accessible base may remove most of the practical barrier. It is only appropriate when the actual user can cross that finished transition safely.
Residential codes and ADA
ADA shower standards are valuable references for dimensions, clearances, controls, grab bars, seats, and openings, but they do not automatically govern an ordinary private residence used only as housing. Requirements depend on the housing type, project scope, Florida codes, local jurisdiction, and—in some multifamily housing—other accessibility laws.
Important: A product marketed as “ADA compliant” does not make the installed bathroom compliant. Where a legal standard applies, the surrounding room and installed configuration matter too.
Compare more than the finish
The proposal should explain the accessibility goal and the hidden construction—not merely promise a beautiful new shower.
Plan the budget
Price depends on whether the project is a standardized low-threshold system, a conventional shower replacement, or custom curbless and wheelchair-accessible construction. Drain relocation, slab work, waterproofing, room layout, materials, glass, seating, permits, and building requirements can change the scope substantially.
Related bathroom planning
Start here when removing the bathtub wall is the main objective and a conventional low-threshold footprint may be enough.
Compare grab bars, seating, handheld equipment, lighting, flooring, toilet support, and smaller layout changes.
Plan secure attachment and placement for the actual shower, toilet, or transfer routine.
Explore other home-access and mobility solutions available across South Florida.
Clear answers
In Miami-Dade, Broward, and Palm Beach, accessible showers typically cost $3,500–$15,000. A tub-to-shower conversion starts around $3,500 and most land between $4,000 and $8,000. A curbless, zero-entry, or roll-in shower runs $8,000–$15,000 because the floor is re-sloped for a linear drain. The written quote after a free measurement sets the price.
Many accessible or walk-in shower projects are installed within about a week of the assessment. The free in-home assessment comes first, and the written quote often comes within about two days of the measurement. A permit, which plumbing changes typically need, or an HOA or condo association approval can add time, and that step is identified during the assessment. A curbless or roll-in shower needs the floor re-sloped for a linear drain and is a bigger project, so the matched contractor gives that timeline in writing after measuring. Safe In Place connects homeowners in Miami-Dade, Broward, and Palm Beach with a licensed, vetted local contractor.
A licensed contractor installs it. Safe In Place does the free in-home assessment and matches one licensed contractor in Broward, Miami-Dade, or Palm Beach County. We connect you with a licensed, vetted local contractor. For Broward County, see who can install a walk-in shower for a senior: https://safeinplace.org/guides/walk-in-shower-for-seniors-broward.
A tub-to-shower conversion reuses the bathtub footprint and usually keeps a low threshold. It typically costs $3,500–$8,000. A curbless, zero-entry, or roll-in shower has a level entry and needs the floor re-sloped, usually with a linear drain. That work is typically $8,000–$15,000.
They can be. A grab bar only helps when it is anchored into studs or rated hardware, never a suction cup. Two grab bars on their own start at $350. The shower or stair lift is usually the larger job.
Miami-Dade, Broward, and Palm Beach counties only, in English and Spanish.
Safe In Place does not promise that Medicare, insurance, or the VA will pay. Original Medicare generally does not cover a permanent bathroom remodel. Eligible veterans can ask about VA home-improvement programs and VA Form 10-0103. Confirm any approval in writing before the project starts.
It is a free in-home visit. Safe In Place looks at who uses the bathroom and how the room is built, then matches one licensed contractor. The written quote comes after the measurement. There is no obligation to continue.
ADA measurements are a useful reference. They do not automatically govern an ordinary private home. The contractor should say which rules apply to that address, including permits and any condo or association approval.
A walk-in shower for a parent may qualify as a federal medical expense. This is general information, not tax advice. IRS Publication 502, Capital Expenses (https://www.irs.gov/publications/p502), says amounts you pay for special equipment installed in a home, or for improvements, can be included in medical expenses if their main purpose is medical care for you, your spouse, or your dependent. The cost of a permanent improvement is reduced by any increase in the value of the home. If the value is not increased, the entire cost is included as a medical expense. Certain improvements made to accommodate a home to a disabled condition of you, your spouse, or your dependents who live with you do not usually increase the home's value, and the IRS says that cost can be included in full. Those improvements include installing support bars or other bathroom modifications, modifying stairways, and installing porch lifts and other forms of lifts. Elevators generally add value. Only reasonable costs to accommodate the home are considered medical care. Additional costs for architectural or aesthetic reasons are not medical expenses. IRS Topic 502 (https://www.irs.gov/taxtopics/tc502) says you must itemize on Schedule A (Form 1040), and that only the part of your total unreimbursed medical expenses for the year above 7.5% of adjusted gross income may be deducted. An adult child may include a parent's medical expenses the child paid if the parent was the child's dependent, either when the medical care was provided or when the child paid the expenses. The IRS caregivers FAQ also covers some parents who would have been dependents except for the gross-income test or a joint return. See that FAQ for the details (https://www.irs.gov/faqs/irs-procedures/for-caregivers/for-caregivers-5). Florida has no state personal income tax. Keep the written scope, invoices, and proof of payment, and ask a qualified tax professional. Safe In Place offers a free in-home assessment and connects the family with a licensed, vetted local contractor.
Local guidance
Review property conditions, the local permit path, and county resources that can change the next step.
Enter a 5-digit ZIP code to check availability.
Tell us who will use the shower, what is difficult today, and what the bathroom is like. We’ll help clarify the right next step and connect you with appropriate local help.